首页> 外国专利> Method for the production of double shell having internal and external shell, and/or cylinders of boost dryer unit, comprises connecting the internal and the external shells with one another over a sleeve-like bolt

Method for the production of double shell having internal and external shell, and/or cylinders of boost dryer unit, comprises connecting the internal and the external shells with one another over a sleeve-like bolt

机译:具有内壳和外壳的双壳和/或升压干燥器单元的圆筒的生产方法包括通过套筒状螺栓将内壳和外壳相互连接

摘要

The method comprises connecting internal and the external shells (10, 12) with one another over a sleeve-like bolt (16), which is contacted with the internal shell and also with the external shell. The bolt and the shells are pressed against each other in the area of contact zone (18) and the bolt is transferred in rotation in order to bring the both contact zones through the emerging frictional heat of the bolt and the shells. A welding connection (22) reforms between the bolt and the shells. The bolt is pressed against the shells. The method comprises connecting internal and the external shells (10, 12) with one another over a sleeve-like bolt (16), which is contacted with the internal shell and also with the external shell. The bolt and the shells are pressed against each other in the area of contact zone (18) and the bolt is transferred in rotation in order to bring the both contact zones through the emerging frictional heat of the bolt and the shells. A welding connection (22) reforms between the bolt and the shells. The bolt is pressed against the shells in order to weld with a rotation of the bolt simultaneously with the shells. The rotation of the bolt is adjusted after melting the bolts and the shells and the bolts and the shells are pressed against each other up to the welding connection is cooled at a predetermined temperature. The pressure for pressing together is selected so that it is same or higher than the contact pressure during the previous welding process. One of the both shells is equipped with an opening and the bolt is guided with the end through the opening and is pressed with the end against the other shell in order to produce the relevant friction contact. The bolt is subjected with the shell having the opening over a seat and the friction contact is produced between the bolt and the shell over the seat. The friction contact is produced between the bolt and the shell having the opening over the straight or conical seat. A protrusion of the bolt appeared in the area of the opening is taken out after the welding process. The radial interval between the shells is held during the welding process through support elements subjected between the shells. The shells is supported the shells are supported during the welding process partially through magnetic and/or pneumatic holding power. The bolt is subjected with its both front sides with the shells and the bolt is welded on its both front sides with the shells over a coaxial slider subjected through a shell opening. The bolt parts are welded with the shells and are welded during or after the connection between the bolt and the shell.
机译:该方法包括在套筒状螺栓(16)上将内壳(10)和外壳(12)彼此连接,该套筒状螺栓(16)与内壳以及外壳接触。螺栓和壳体在接触区域(18)的区域中相互挤压,螺栓旋转旋转,以使两个接触区域通过螺栓和壳体的新产生的摩擦热。螺栓和壳体之间重新形成焊接连接​​(22)。螺栓压在外壳上。该方法包括在套筒状螺栓(16)上将内壳(10)和外壳(12)彼此连接,该套筒状螺栓(16)与内壳以及外壳接触。螺栓和壳体在接触区域(18)的区域中相互挤压,螺栓旋转旋转,以使两个接触区域通过螺栓和壳体的新产生的摩擦热。螺栓和壳体之间重新形成焊接连接​​(22)。为了将螺栓与壳体同时旋转,将螺栓压靠在壳体上。在熔化螺栓和壳体之后,调节螺栓的旋转,并且将螺栓和壳体彼此压紧直至将焊接连接冷却到预定温度。选择压在一起的压力,使其等于或高于先前焊接过程中的接触压力。两个壳体中的一个设有一个开口,螺栓的一端穿过该开口,然后将一端压在另一个壳体上,以产生相应的摩擦接触。螺栓受到具有在座上方的开口的壳体的作用,并且在螺栓与座上方的壳体之间产生摩擦接触。在螺栓和外壳之间产生摩擦接触,该外壳在笔直或圆锥形阀座上具有开口。在焊接过程之后,取出出现在开口区域的螺栓突出部分。壳体之间的径向间隔在焊接过程中通过承受在壳体之间的支撑元件保持。壳体被支撑在焊接过程中,壳体被部分地通过磁性和/或气动保持力支撑。螺栓的两个前侧与壳体接触,并且螺栓的两个前侧与壳体在穿过壳体开口的同轴滑块上焊接。螺栓部件与壳体焊接,并且在螺栓与壳体之间的连接期间或之后进行焊接。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号