Hybrid pier and continuity execution method using the hybrid pier
Hybrid pier and continuity execution method using the hybrid pier
展开▼
机译:混合墩及使用混合墩的连续性执行方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
The present invention can be converted easily in a simple form, while removing the bridge gyojwa devices form a continuous bridge by using a hybrid structure with a predetermined angle of intersection, and it relates to a construction method to perform and easy sequencing the sequencing of the bridge construction, the vertical surface and the horizontal plane is made of steel plate of T-shaped plurality of holes are formed at predetermined intervals in the vertical plane, and the distal end a plurality of holes formed in the reinforcing plate is bonded and the outer upper flange of the first process of producing the H-beam girders of a plurality of holes formed; A second process of coupling the upper end of the plate back to the bridge piers; Around the hole arranged in the vertical plane of the plate, and the vertical surface of the front portion thereof on the left and right sides of the girder combined disposed facing each other, the upper flange adjacent portion of the associated girders a plurality of connection holes are formed in the coupling plate a third process of using loose coupling; The cross-linked, but pour a concrete floor plate girders, and the fourth step of placing the connection coupling plate, except for the parts that are combined; The process of claim 5 wherein the connection coupling plate coupled to complete the concrete after the rigid bottom plate; And a sixth step of placing the connecting plate is installed in combination with concrete area.
展开▼