To dig the cloth digging channel in the installation construction method of the earth finishing blow
To dig the cloth digging channel in the installation construction method of the earth finishing blow
展开▼
机译:土方吹塑安装施工方法中挖布挖沟
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To facilitate work without hindering traffic of a place by putting a cover on a trench excavation groove without backfilling and digging up the trench excavation groove for an earth retaining pile.;SOLUTION: In this installing construction method of the earth retaining pile arranged on an inner wall of an excavating hole, steel sheet piles 2 are arranged on both sides of the excavated trench excavation groove 1. A beam material is extended between these steel sheet piles 2 via a waling material 3. In the trench excavation groove 1 requiring an investigation, after investigating a buried pipe, the waling material 3 and the beam material are removed from the trench excavation groove 1. A leg part 5 attached with these materials and a lining member 7 composed of lining plates 6 arranged on the leg part are inserted into the trench excavation groove 1. An upper surface of the respective lining plates 6 is adjusted in the almost same as the ground surface, and is extended between the steel sheet piles 2 by using the beam material and the waling material 3 installed in the leg part 5. The lining member 7 is removed later. The earth retaining pile 8 is driven in the ground from the trench excavation groove 1. The lining member 7 is arranged in the trench excavation groove 1 up to starting open-cut of the ground surface surrounded by these earth retaining piles 8.;COPYRIGHT: (C)2002,JPO
展开▼