首页> 外国专利> PRODUCTION SCHEDULED NUMBER MANAGEMENT DEVICE BY COMPUTER, PRODUCTION SCHEDULED NUMBER MANAGEMENT PROGRAM AND RECORDING MEDIUM

PRODUCTION SCHEDULED NUMBER MANAGEMENT DEVICE BY COMPUTER, PRODUCTION SCHEDULED NUMBER MANAGEMENT PROGRAM AND RECORDING MEDIUM

机译:按计算机,按计划生产的编号管理程序和记录介质的按计划生产的编号管理设备

摘要

PROBLEM TO BE SOLVED: To provide a production scheduled number management device capable of securing a necessary production scheduled number without imparting influence to component procurement even if fluctuation occurs in a production scheduled number.;SOLUTION: A plurality of unit periods including a decision target unit period and a component previous arrangement period are set as a management period. A cumulative total of the production scheduled number, and a component previous arrangement number cumulative total are found about each the unit period within the management period. A producible upper limit value cumulative total in each the unit period is initially set with respect to the first setting of the management period or the like on the basis of the component previous arrangement number cumulative total. A smaller one of the preceding upper limit value cumulative total and the component previous arrangement number cumulative total is set as this upper limit value cumulative total with respect to the setting on and after the second times, and is set as a value sufficiently larger than the production scheduled number in the last unit period. A difference between the upper limit value cumulative total and the production scheduled number cumulative total is found as a margin value cumulative total in each the unit period, it is decided whether the unit period wherein the found margin value cumulative total is less than zero is present or not, and the production scheduled number is adjusted inside the management period such that it becomes absent when it is present.;COPYRIGHT: (C)2006,JPO&NCIPI
机译:解决的问题:提供一种生产预定号管理装置,即使在生产预定号发生波动的情况下,也能够确保必要的生产预定号而不会影响零件的采购。解决方案:包括确定目标单元的多个单元周期周期和部件预先布置周期被设置为管理周期。关于管理周期内的每个单位周期,可以找到生产计划编号的累积总数和部件先前布置编号的累积总数。相对于管理期间的第一设定等,首先根据构成要素在先配置数累积合计来设定每个单位期间内的可产生的上限值累积合计。相对于第二次和之后的设置,将先前的上限值累积总数和部件先前布置数量累积总数中的较小者设置为该上限值累积总数,并且被设置为充分大于上限值的累积值。最后一个单位期间的生产计划编号。求出上限值累计合计与生产预定数量累计合计之间的差作为每个单位期间内的保证​​金值累计合计,判定是否存在所求出的保证金值累计合计小于零的单位期间。是否存在,并且在管理期内调整生产计划编号,以使其不存在。;版权所有:(C)2006,JPO&NCIPI

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号