首页> 外国专利> Operation of steelmaking electric arc furnace during tapping stage includes the supply of electrical energy to electrodes during this stage

Operation of steelmaking electric arc furnace during tapping stage includes the supply of electrical energy to electrodes during this stage

机译:出钢阶段炼钢电弧炉的运行包括在此阶段向电极提供电能

摘要

The electrodes (2) are supplied with electrical energy, at least partially, during tapping by an operator or timer. A model for energy and mass balance is employed in a controller to control position of and energy supply to the electrodes. An independent claim is included for the necessary equipment.
机译:电极(2)至少在操作者或定时器的敲击期间被供应电能。在控制器中采用能量和质量平衡模型来控制电极的位置和向电极的能量供应。包括必要设备的独立索赔。

著录项

  • 公开/公告号DE102004040494B3

    专利类型

  • 公开/公告日2005-07-21

    原文格式PDF

  • 申请/专利权人 SIEMENS AG;

    申请/专利号DE20041040494

  • 发明设计人 MATSCHULLAT THOMAS;STUERMER UWE;

    申请日2004-08-20

  • 分类号C21C5/52;F27B3/08;

  • 国家 DE

  • 入库时间 2022-08-21 22:00:42

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号