首页> 外国专利> Seawater exchange breakwater of area that the difference between the rise and fall of the tide is large

Seawater exchange breakwater of area that the difference between the rise and fall of the tide is large

机译:潮涨落差大的区域的海水交换防波堤

摘要

PURPOSE: A sea water interchange breakwater in an area with a big tidal range is provided to prevent waves from being transmitted to an inland sea regardless of the tidal range although tide is high and make sea water smoothly flow. CONSTITUTION: In a sea water interchange breakwater in an area with a big tidal range, bodies of the sea water interchange breakwater are built by connecting plural unit structures(10). For the front of the unit structures, plural-stepped front wall bodies(11,11a,11b) are vertically installed. A semicircular vertical projected rod(12) is installed to the front of each front wall body. Plural sea water-passing holes(13) are bored between the semicircular vertical projected rods of the front wall bodies. The right and left sides of bottom plate surfaces are closed up by stepped-type right and left walls(14,14a) vertically connected to each front wall body. The bottom plate surfaces are vertically connected to the lower rear side of each front wall body. Space parts are installed between the bottom plate surfaces. Side sea water-passing holes(17) are bored to the front wall bodies of the stepped-type right and left walls. A rear wall body(18) is vertically installed to the end of the bottom plate surface of the rear side of the uppermost-end front wall body. Ripraps(3) are filled to the inside of the rear wall body. On the uppermost ends of the front wall body, the rear wall body, and the stepped-type right and left walls, cap concrete(20) is cast in place.
机译:目的:在潮汐范围大的地区设置海水交换防波堤,以防止潮汐高潮时不论潮汐范围如何波都传到内陆海域,并使海水平稳流动。组成:在潮汐范围大的地区的海水交换防波堤中,通过连接多个单元结构(10)来建造海水交换防波堤的主体。对于单元结构的前部,竖直地安装了多个阶梯状的前壁体(11、11a,11b)。半圆形的垂直突出杆(12)安装在每个前壁主体的前部。在前壁体的半圆形垂直突出杆之间钻有多个海水通孔(13)。底板表面的左侧和右侧通过垂直连接到每个前壁主体的阶梯式右侧壁和左侧壁(14,14a)封闭。底板表面垂直地连接到每个前壁主体的下后侧。在底板表面之间安装了空间部件。在阶梯式左右壁的前壁主体上钻有侧面海水通过孔(17)。在最上端的前壁主体的后侧的底板表面的端部垂直地安装有后壁主体(18)。 Ripraps(3)填充到后壁主体的内部。在前壁主体,后壁主体以及阶梯式左右壁的最上端,浇铸有盖混凝土(20)。

著录项

  • 公开/公告号KR20040017066A

    专利类型

  • 公开/公告日2004-02-26

    原文格式PDF

  • 申请/专利权人 YANG WON HOI;

    申请/专利号KR20020049178

  • 发明设计人 YANG WON HOI;

    申请日2002-08-20

  • 分类号E02B3/06;

  • 国家 KR

  • 入库时间 2022-08-21 22:49:44

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号