首页> 外国专利> METHOD FOR MEASURING DISPLACEMENT OF GROUND SURFACE OR SUBBASE COURSE IN CASE OF SHIELD EXCAVATION AND METHOD AND DEVICE FOR CONTROLLING DISPLACEMENT OF SUBBASE COURSE

METHOD FOR MEASURING DISPLACEMENT OF GROUND SURFACE OR SUBBASE COURSE IN CASE OF SHIELD EXCAVATION AND METHOD AND DEVICE FOR CONTROLLING DISPLACEMENT OF SUBBASE COURSE

机译:盾构施工情况下地面或基层课程位移的测量方法及基层课程位移的控制方法和装置

摘要

PROBLEM TO BE SOLVED: To provide a method for accurately measuring the displacement of a ground surface or a subbase course in the case of a shield excavation by using a noncontact type distance measuring instrument.;SOLUTION: When a shield tunnel 33 is constructed, a plurality of fixed places are set at positions higher than a ground along a shield propulsion route 35, light wave type range finders 44a and 44b as the noncontact type distance measuring instruments are installed at the fixed places respectively, a plurality of measuring points 38 are set on the ground surface or near the subbase course of the upper section of the propulsion route, distances from the fixed places to the measuring points 38 are measured by the range finders 44a and 44b for arbitrary periods before the shield propulsion, during its propulsion and after its propulsion, vertical distances among the fixed places and the measuring points 38 are arithmetically operated from these measured distances, and the displacement of the ground surface or the subbase course in the shield excavation is measured from the vertical distances.;COPYRIGHT: (C)2003,JPO
机译:解决的问题:提供一种通过使用非接触式测距仪来精确测量盾构开挖情况下地面或基层位移的方法。解决方案:构造盾构隧道33时,在沿着屏蔽推进路径35的比地面高的位置上设置多个固定位置,在该固定位置上分别安装有作为非接触式测距仪的光波型测距仪44a,44b,并设置了多个测量点38。在盾构推进之前,期间以及推进之后以及之后的任意时间段,测距仪44a和44b在推进路线的上部的地面上或附近的地面上或附近,从固定位置到测量点38的距离进行测量。它的推进力,固定位置和测量点38之间的垂直距离是根据这些测量距离进行算术运算的,从竖向距离测量盾构开挖中地面或基层的位置。版权所有:(C)2003,JPO

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号