Covering works construction method null of the shield tunnel the internal pressure operation

机译:盾构隧道盖工程施工方法无内压作业

摘要

PURPOSE:To reduce the construction period and cost in a lining method of shielded tunnel receiving an inner pressure. CONSTITUTION:A plurality of arc steel plates are appropriately welded at the tail of shield body 1 while excavating the ground by a shielding machine to form a steel pipe body 2 correspond to the outer diameter of shielded tunnel to be constructed. A plurality of large and small concrete arc-shaped main segments 3 and key segments 4 are assembled in the steel pipe body. The key segments 4 are appropriately pushed in toward the front having a sharp end and thereby the whole segments 5 are widened to press the steel pipe body 2 from the inside face. While conducting prestress in the steel pipe, segment rings 5 are pressed to contact therewith to unify them as a unit.
机译:目的:为减少隧道内压的衬砌方法,减少施工周期和成本。组成:在用屏蔽机开挖地面的同时,在屏蔽体1的尾部适当焊接了许多弧形钢板,以形成与要建造的屏蔽隧道的外径相对应的钢管体2。钢管主体中组装有多个大,小的混凝土弧形主段3和关键段4。适当地将键段4朝着具有尖锐端部的前面推入,从而使整个段5变宽,以从内侧按压钢管主体2。在对钢管施加预应力的同时,按压节段环5使其接触以将它们作为一个单元统一。

著录项

  • 公开/公告号JP3307724B2

    专利类型

  • 公开/公告日2002-07-24

    原文格式PDF

  • 申请/专利权人 前田建設工業株式会社;

    申请/专利号JP19930189172

  • 发明设计人 松井 芳彦;北川 滋樹;

    申请日1993-06-30

  • 分类号E21D11/08;

  • 国家 JP

  • 入库时间 2022-08-22 01:00:38

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号