CONSTRUCTION METHOD OF INTAKE TUNNEL AND TUNNELING MACHINE THEREFOR
CONSTRUCTION METHOD OF INTAKE TUNNEL AND TUNNELING MACHINE THEREFOR
展开▼
机译:进洞隧道的施工方法及其隧道机
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To assemble segments having large-sized intake openings while restraining inflow of underground water to construct an intake tunnel. ;SOLUTION: On one part of a skin plate in contact with the ground, segments 20 formed with intake openings 22 are assembled to correspond to the advance of a tunneling machine 1, and a intake tunnel is constructed in an aquifer 60. At this time, underground water from the intake opening into the intake tunnel under construction is cut off by a plurality of steps of tail seals provided on the inner face of the shell 4 on the tail of the tunneling machine 1 along the circumferential direction so as to stride over the intake openings 22.;COPYRIGHT: (C)1999,JPO