SOIL-CEMENT-COMPOSITED STEEL PIPE PILE CONSTRUCTION AND STEEL PIPE PILE USED FOR ITS CONSTRUCTION
SOIL-CEMENT-COMPOSITED STEEL PIPE PILE CONSTRUCTION AND STEEL PIPE PILE USED FOR ITS CONSTRUCTION
展开▼
机译:土-水泥复合钢管桩施工及用于施工的钢管桩
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE:To certainly reinforce a pile head section, by setting a ring-formed concrete layer on the outer peripheral section of a steel pipe column set in a cement column, in a state that the concrete layer is continuously set at the upper end of the soil cement column formed in a vertical slot, at the upper end section of the vertical slot. CONSTITUTION:By an auger, through ground 4, a vertical slot is bored and cement milk is injected therein, and a soil cement column 2 is formed, and before the cement column 2 is hardened, a steel pipe pile 1 is inserted in the cement column 2. After that, at the upper end section of the vertical slot, a ring-formed prefabricated concrete layer 3 is set fitted externally on the head section of the pile 1 in a state that the layer 3 is mounted on the upper end of the cement column 2. After that, a space between the concrete layer 3 and the pile 1 is filled up with mortar or concrete 5.
展开▼