首页> 外国专利> Generation plan decision device, power generation planning method and power generation planning decision program

Generation plan decision device, power generation planning method and power generation planning decision program

机译:生成规划决策装置,发电规划方法和发电规划决策计划

摘要

PROBLEM TO BE SOLVED: To provide a power generation plan formulating device, a power generation plan formulating method, and a power generation plan formulating program capable of formulating a power generation plan in view of performance or groups of power stations.SOLUTION: According to one embodiment, a power generation plan formulating device includes a power generation information processing section for processing information concerning performance or groups of power stations, and comprises the power generation information processing section for forecasting performance of the power stations in view of data relating to the surroundings of nature or for registering data of the power stations belonging to the group as well as data of limitations to the group as a definition of the group of the power stations. The device further comprises a power generation plan creating section for creating a power generation plan of the power stations based on the performance of the power stations forecasted by the power generation information processing section or on the group definition registered at the power generation information processing section.SELECTED DRAWING: Figure 1
机译:要解决的问题:提供一种发电计划配方装置,发电计划配方方法,以及能够根据能量站或电力站组配制发电计划的发电计划制定程序。案例:根据一个实施例,发电计划配制装置包括发电信息处理部分,用于处理有关电台的性能或电台组的信息,并且包括用于预测电台的性能的发电信息处理部分,鉴于与周围环境有关的数据性质或用于注册属于该组的电站的数据以及对本组的限制数据作为电站组的定义。该设备还包括发电计划,用于基于由发电信息处理部分预测的电站的性能或在发电信息处理部分登记的组定义上基于功率站的性能来创建电站的发电计划的发电计划。选定的绘图:图1

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号