Segmental Structure with Replaceable CIP Deck Slab

机译:带可更换CIP甲板板的分段结构

获取原文
获取原文并翻译 | 示例

摘要

Precast segmental technology allows a fast and a very efficient construction of bridges. Bridges with spans up to 40 m are usually erected span-by-span. The segments are assembled on the erection truss and are post-tensioned by external tendons anchored in pier segments - see Figs.1a and 2a. Bridges of larger spans are usually erected in balance cantilevers that start above the piers; during the erection the segments are post-tensioned by internal cantilever tendons -see Fig.1b1. After casting the mid-span joint continuity external tendons are post-tensioned- see Figs. 1b2 and 2b. A box girder with overhangs usually forms the deck of segmental structures;. the deck seldom has a double tee or channel section.
机译:预制分段技术可以快速高效地建造桥梁。跨度最大为40 m的桥梁通常是跨度竖立的。这些节段组装在安装桁架上,并通过锚固在墩节段中的外部筋进行后张拉-见图1a和2a。大跨度的桥梁通常竖立在桥墩上方的平衡悬臂中。在勃起过程中,节段由内部悬臂肌腱后张-见图1b1。铸造中跨关节连续性后,外部肌腱被后张紧-见图。 1b2和2b。带有悬挑的箱形梁通常形成分段结构的甲板。甲板很少有三通或三通部分。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号