首页> 外文会议>2017 13th International Electrical Insulation Conference >Deployment of an online partial discharge monitoring system for power station with focus on gas turbine generators
【24h】

Deployment of an online partial discharge monitoring system for power station with focus on gas turbine generators

机译:部署针对燃气轮机发电机的电站在线局部放电监控系统

获取原文
获取原文并翻译 | 示例

摘要

This paper reports on the deployment of a continuous online partial discharge (OLPD) system to monitor a gas turbine generator at a combined cycle gas turbine (CCGT) power station. The site consists of two gas turbines rated at 250 MW and one steam turbine rated at 260 MW.
机译:本文报告了在联合循环燃气轮机(CCGT)电站部署连续在线局部放电(OLPD)系统以监视燃气轮机发电机的情况。该站点包括两台额定功率为250 MW的燃气轮机和一台额定功率为260 MW的蒸汽轮机。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号