首页> 外文会议>2017 IV International Electromagnetic Compatibility Conference >EMC management and control plan for mass rapid transit railway project in Malaysia
【24h】

EMC management and control plan for mass rapid transit railway project in Malaysia

机译:马来西亚地下快速铁路项目的EMC管理和控制计划

获取原文
获取原文并翻译 | 示例

摘要

Today, railways have numerous communication, navigation, propulsion, power and control systems. These systems are operating in a very limited space resulting in significant interference issues. Therefore, it is crucial to take into the account the Electromagnetic Compatibility (EMC) through the project life time starting in the design stage. This paper presents briefly the EMC management and control plan of Mass Rapid Transit (MRT) to ensure that the various railway subsystems can function satisfactorily in their intended electromagnetic environment. The EMC approach taken in the MRT Railway project in Malaysia is outlined in this paper. All the MRT railway communications systems should not disturb the operation of each other or the other nearby systems. These communications systems should not be also susceptible to any intentional/unintentional EMI sources in the MRT railway environment. The EMC management and control plan is helpful to avoid EMC/EMI issues of MRT such as EMI sources/ victims identification and risk assessment starting from the design to commissioning. Commonly, all the equipment on the railway must comply to the relevant EMC railway standards such as EN50121. Furthermore, cable management is significantly considered especially for very limited spaces such as tunnels. Finally, the necessary mitigation techniques are recommended to overcome the unexpected EMC challenges which may occur after commissioning.
机译:如今,铁路拥有众多的通信,导航,推进,动力和控制系统。这些系统在非常有限的空间中运行,从而导致严重的干扰问题。因此,从设计阶段开始的整个项目生命周期中考虑电磁兼容性(EMC)至关重要。本文简要介绍了大众捷运系统(MRT)的EMC管理和控制计划,以确保各个铁路子系统在其预期的电磁环境中都能令人满意地运行。本文概述了马来西亚捷运铁路项目中采用的EMC方法。所有的捷运铁路通信系统都不应干扰彼此或附近其他系统的运行。在MRT铁路环境中,这些通信系统也不应受到任何有意/无意EMI的影响。 EMC管理和控制计划有助于避免MRT的EMC / EMI问题,例如从设计到调试开始的EMI来源/受害者识别和风险评估。通常,铁路上的所有设备必须符合相关的EMC铁路标准,例如EN50121。此外,尤其是在隧道等非常有限的空间中,尤其要考虑电缆管理。最后,建议使用必要的缓解技术来克服调试后可能发生的意外EMC挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号