首页> 外文会议>Asia Pacific Symposium on Safety; 20051102-04; Shaoxing(CN) >Use of Comprehensive Techniques of Geologic Advanced Forecast in Wulong Railway Tunnel
【24h】

Use of Comprehensive Techniques of Geologic Advanced Forecast in Wulong Railway Tunnel

机译:乌龙铁路隧道地质超前预报综合技术的运用

获取原文
获取原文并翻译 | 示例

摘要

The quantitative and exact technique of geologic advanced forecast in tunnel construction is one of difficult technical problems unsolved in the world. In this paper, based on Wulong railway tunnel the multi-methods of geologic advanced forecast are used and the forecasting results comprehensively analyzed, which supply the decision-making basis for the optimization of construction plan, insure the construction safety and the railway operation safety in the future.
机译:隧道施工中地质超前预报的定量准确技术是世界上尚未解决的难题之一。本文在武隆铁路隧道的基础上,采用了地质超前预报的多种方法,对预报结果进行了综合分析,为优化施工方案提供决策依据,确保了施工安全和铁路运营安全。未来。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号