The 90-year old Clear Lake dam was modified for overtopping protection in 1996. The dam is a rockfill embankment, with a steel sheet-pile cut-off wall. Founded on landslide talus, the dam increased the storage in a natural lake created by the slide. The original outlet was a 20" riveted steel outlet, with a bifurcated section using two 16" conduits placed within a timber crib tunnel, and gates located under the crest of the dam. In conjunction with the armoring project, the outlet was renovated to provide control and guard gates in an upstream wet-well gate tower. When the reservoir was refilled, sink-holes developed over the connection between the new and old outlet conduits. As plans were being developed to repair the outlet, investigations revealed that the outlet was collapsed, and release flows apparently were being conveyed through the rockfill embankment itself. The subsequent repair design entailed soft ground tunneling under the dam, and grouting a PVC conduit within the tunnel.
机译:这座具有90年历史的Clear Lake大坝于1996年进行了改建,以保护山顶。该大坝是堆石路堤,带有钢板桩防渗墙。大坝建在滑坡距骨上,增加了在滑坡形成的天然湖泊中的蓄水量。最初的出口是20英寸的铆接钢出口,其分叉部分使用放置在木婴儿床隧道内的两个16英寸导管以及位于坝顶下方的闸门。结合装甲项目,对出口进行了翻新,以在上游湿井闸门塔中提供控制闸和防护闸。当储水箱注满水时,新旧排水管之间的连接处会形成水槽孔。在制定维修出口计划的过程中,调查显示,出口已倒塌,释放的水流显然是通过堆石路堤本身输送的。随后的维修设计包括在大坝下开挖软土地基,并在隧道内注浆PVC导管。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号