Department of Civil and Transportation Engineering, Ajou University, South Korea;
Water Supply Business Division, Korea Water Resources Corporation, South Korea;
Department of Civil and Transportation Engineering, Ajou University, South Korea;
Department of Civil and Transportation Engineering, Ajou University, South Korea;
Department of Civil Engineering, Ajou University, South Korea;
Engineering Research Institute, Ajou University, South Korea;
flood control; reservoir system operation; diversion tunnel;
机译:根据分流式水力发电站的脱水河道生态流量需求,调整两个梯级水库的运行
机译:具有预测更新的两级水库库存管理:跨流域调水项目中多水库运行的视角
机译:Qianping Chaploir导流隧洞上部的爆炸测试与数值模拟分析
机译:使用转移隧道的储层系统操作
机译:确定洪水期间河流水库系统实时最优运行的优化/模拟模型。
机译:利用矩阵结构优化多功能水库系统运行(案例研究:Karun和Dez水库大坝)
机译:砂岩引流隧道中的机械参数反转和运行期间的稳定性分析
机译:水控制手册。防洪明尼苏达河,明尼苏达州。 Lac Qui parleReservoir和march Lake Reservoir,包括march Lake Dam,Lac Qui parle Dam,Chippewa River Diversion Dam和Watson sag Weir,Watson,minnesota。调整