首页> 外文会议>Innovate integrate amp; invigorate >EIA/IS-731 to CMMI - A Guide for Transition
【24h】

EIA/IS-731 to CMMI - A Guide for Transition

机译:EIA / IS-731到CMMI-过渡指南

获取原文
获取原文并翻译 | 示例

摘要

The Capability Maturity Model~® Integration (CMMI~(SM) project has integrated the Capability Maturity Model for Software (SW-CMM~®) version 2C, Electronics Industry Alliance (EIA/IS-731) Systems Engineering Capability Model version 1.0, and the Integrated Product Development Capability Maturity Model (IPD-CMM) v0.98a. For the systems engineering community that has been using EIA/IS-731, this integration of CMMs has resulted in many changes to the practices and amount of information contained in the model. The purpose of this paper is to provide guidance for transition to CMMI by describing differences in the models that should be considered in making the transition.
机译:能力成熟度模型〜(CMMI〜(SM))项目已集成了软件能力成熟度模型(SW-CMM〜®)2C版,电子工业联盟(EIA / IS-731)系统工程能力模型1.0版和集成产品开发能力成熟度模型(IPD-CMM)v0.98a。对于一直使用EIA / IS-731的系统工程社区,这种CMM集成导致对实践和信息中包含的信息量进行了许多更改。本文的目的是通过描述进行过渡时应考虑的模型差异,为过渡到CMMI提供指导。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号