首页> 外文会议>Annual Conference and Expo of the Institute of Industrial Engineers >Risk, schedule and costs in project management: a bibliometric analysis
【24h】

Risk, schedule and costs in project management: a bibliometric analysis

机译:项目管理中的风险,进度和成本:学生分析

获取原文

摘要

This study's main objective is to understand the state of the art academic research that relates the variables "cost", "risk" and "schedule", and together with the perspective of project management. For this, was performed a literature search and exploratory using a keyword tree on the subject, in which, using Boolean logic, was raised a sample of articles in the journal search engine Capes. The software used as a database of sample was EndNote. Then the sample was refined by reading abstracts and use of Refviz software features. As a result, it was possible by means of descriptive statistics to identify the main vehicle of publication, research centers and researchers more involved in the publications. In addition, were identified tools, techniques, methodologies, bibliographic references and case studies over the sample worked in the documents.
机译:本研究的主要目标是了解艺术学术研究的国家,与项目管理的角度相关的变量“成本”,“风险”和“进度”。为此,在主题上使用关键字树进行了文献搜索和探索性,其中,使用布尔逻辑,在期刊搜索引擎帽中提出了一系列物品的样本。用作样本数据库的软件是终点。然后通过阅读摘要和使用refviz软件功能来改进样本。结果,通过描述性统计可以识别出版物更符合出版物的主要发布,研究中心和研究人员。此外,还确定了在文件中工作的样本的工具,技术,方法,书目参考文献和案例研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号