Assessment of Piling Machine Operation Performance Using Overall Equipment Effectiveness (OEE) During Piling Construction at Universiti Teknikal Malaysia Melaka

机译:利用整体设备效果(OEE)在Universiti Teknikal Malaka的平台建设中评估打桩机运行性能

获取原文

摘要

Unlike the manufacturing industry which is synonymous with a lean concept, the construction industry is perceived to deal with difficulties in managing resources, such as manpower and financial, caused pollution to the environment as well as non-value added tasks. These situations motivate the construction industry to apply the lean concept. This paper aims to examine the performance of piling machine operation performance during pile driving activities at the Faculty of Manufacturing Engineering in Universiti Teknikal Malaysia Melaka using Overall Equipment Effectiveness (OEE). OEE is a tool to evaluate the effectiveness of the equipment as well as the efficiency of the organization in utilizing other resources such as manpower and materials. Stopwatch Method was applied to record the time required to complete the pile construction. From the analysis, the value of calculated OEE before the implementation of the site logistic plan was 65.7%. However, the implementation of site logistic plan has successfully minimized non-value added tasks. This was proven when the second cycle of the assessment recorded that the new value of OEE is 78.0% indicating a significant improvement in the performance of piling machine operation performance. It is proven that OEE could enhance the performance of the works and the quality of the end product.
机译:与凭借精益概念的代名容的制造业不同,建筑业被认为处理管理资源(如人力和财务)的困难,导致环境污染以及不增值任务。这些情况激励建筑行业应用精益概念。本文旨在审查在Marakyia Melakal Marakah Melaka大学的制造工程学院桩驾驶活动期间采用整体设备有效性(OEE)的桩驾驶活动。 OEE是一种评估设备的有效性以及组织利用其他资源,如人力和材料的工具。应用秒表方法以记录完成桩结构所需的时间。从分析中,在实施网站后勤计划之前计算的OEE的价值为65.7%。但是,站点后勤计划的实现成功最小化了不增值任务。当评估的第二个周期记录的时候,这是oee的新价值为78.0%,表明打桩机操作性能的性能显着改善。据证明,OEE可以提高作品的性能和最终产品的质量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号