首页> 外文会议>Canadian Society for Civil Engineering annual conference >MATURITY MODELING IN CONSTRUCTION: INTRODUCING THE CONSTRUCTION INDUSTRY MACRO MATURITY MODEL (CIM3)
【24h】

MATURITY MODELING IN CONSTRUCTION: INTRODUCING THE CONSTRUCTION INDUSTRY MACRO MATURITY MODEL (CIM3)

机译:建筑成熟模型:介绍建筑业宏成熟模型(CIM3)

获取原文

摘要

This paper has introduced the Construction Industry Macro Maturity Model or CIM3 which will provide a leading indication of construction industry performance as well as a context in which to compare and interpret construction industry performance between countries / regions. The CIM3 is based on an adaptation of the concept of process maturity and views the construction industry as being comprised of key practice areas (KPAs) which contain key practices. Inherent to the CIM3 is the logical relationship that key practices achieve specific objectives which lead to the realization of the construction industry?s overall performance goals. The robustness and reliability of the CIM3 is rooted in its method of assessment which relies on the use of an expert group to carry out AHP pairwise comparisons as well as the use of a questionnaire survey along with a random verification process.
机译:本文介绍了建筑业宏成熟模型或CIM3,其将提供建筑业绩效的主要迹象以及在国家/地区之间进行比较和解释建筑行业绩效的背景。 CIM3基于改编过程成熟的概念,并将建筑业视为包含关键实践的关键实践领域(KPA)。 CIM3所固有的是关键实践实现特定目标的逻辑关系,这导致建筑业的整体绩效目标的实现。 CIM3的稳健性和可靠性源于其评估方法,依赖于使用专家组进行AHP成对比较以及使用问卷调查以及随机验证过程的使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号