Schedule matters: Understanding the relationship between schedule delays and costs on overruns

机译:安排事项:了解计划延误与超支成本之间的关系

获取原文

摘要

This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does ???directly related to??? actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, ???black swan??? events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.
机译:本文介绍了复杂项目中的日程延误与成本超支之间的关系。它通常被许多项目从业者接受,即成本超支与安排延迟直接相关。但是什么是直接相关的???实际上是什么意思?如果仅在后敏捷人中,计划延迟和相关成本超支的某些原因或根本原因是显而易见的。例如,不切实际的估计,供应链困难,日程安排不足,技术问题,范围变化或风险事件的发生可能会产生负面影响性能。其他因素驾驶计划延误和成本超支可能不太明显且难以量化。这些不太明显因素的例子包括项目复杂性,有缺陷的估计假设,过度乐观,政治因素,黑色天鹅???活动,甚至领导和沟通差。实际上,它甚至可能是日程安排可能是延迟的源头和随后的成本超支吗?通过文献综述,项目从业者的调查以及作者对美国宇航局计划和项目的经验,将分类和检查影响项目时间表延误和成本增长之间关系的各种因素。提交人还将为组织提出一些想法,以考虑有助于了解可能导致或影响复杂项目的计划延误和相关成本增长的因素的认识。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号