This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does ¿¿¿directly related to¿¿¿ actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, ¿¿¿black swan¿¿¿ events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.
机译:本文研究了进度延迟与复杂项目成本超支之间的关系。许多项目从业者普遍认为,成本超支与进度延迟直接相关。但是,“¿”与“¿”直接相关实际上是什么意思?时间表延迟和相关成本超支的某些原因或根本原因很明显,即使只是事后考虑。例如,不切实际的估计,供应链困难,时间表利润不足,技术问题,范围变更或风险事件的发生,可能会对时间表绩效产生负面影响。导致进度延误和成本超支的其他因素可能不太明显,更难以量化。这些不太明显的因素的例子包括项目复杂性,错误的估计假设,过于乐观,政治因素,“黑天鹅”事件,甚至领导和沟通不力。确实,时间表本身是否有可能成为延迟和后续成本超支的原因?通过文献综述,项目从业人员调查以及作者对NASA计划和项目的经验,作者将对影响项目进度延迟与成本增长之间关系的各种因素进行分类和检查。作者还将提出一些构想,供组织考虑,以帮助他们了解可能导致或影响进度延迟和复杂项目相关成本增长的因素。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号