首页> 外文会议>Construction research congress >Recommended Practices for the Cost Control of Highway Project Development
【24h】

Recommended Practices for the Cost Control of Highway Project Development

机译:公路项目开发成本控制的建议措施

获取原文

摘要

Cost escalation is a critical issue that state departments of transportation (DOTs) face throughout project development from concept to completion. A variety of issues and risks impact budgeting and cost management and control activities, which affect adherence to approved project budgets. State DOTs need to utilize effective practices to avoid constant budget adjustments due to cost overruns. The objective of this study is to identify and analyze effective practices for controlling, updating, and maintaining the baseline budget and schedule for highway projects. Through comprehensive interviews with several state DOTs and an extensive content analysis of their guidebooks and manuals, we identify and analyze several effective practices, including those related to budget-based project development for controlling potential costs in the following areas of opportunity: (1) project scope and concept development; (2) concept-level risk identification and assessment; (3) preliminary and final design summary reporting; (4) value engineering and alternative analysis; and (5) cost estimate validation and review. Results of the analysis show that state DOTs struggle with identifying risk factors early in project development and mitigating them during preliminary and final design. The findings can help state DOTs improve their existing practices for highway project budgeting and cost management so that they can maintain initial baseline budgets and schedules while minimizing changes made to them during the project development process.
机译:成本上涨是州交通运输部(DOT)在从概念到完成的整个项目开发过程中面临的一个关键问题。各种问题和风险会影响预算编制,成本管理和控制活动,从而影响对已批准项目预算的遵守。州交通运输部需要采取有效措施,以免由于成本超支而不断进行预算调整。这项研究的目的是确定和分析用于控制,更新和维护基线预算和公路项目进度的有效做法。通过与多个州DOT进行全面访谈并对其指南和手册进行广泛的内容分析,我们确定并分析了几种有效实践,包括与基于预算的项目开发相关的实践,以控制以下机会领域的潜在成本:(1)项目范围和概念发展; (2)概念层面的风险识别与评估; (3)初步和最终设计摘要报告; (4)价值工程和替代分析; (5)成本估算的确认和审查。分析结果表明,州DOT努力在项目开发的早期识别风险因素并在初步设计和最终设计期间减轻风险。这些发现可以帮助州交通运输部改善其现有的公路项目预算和成本管理方法,以便他们可以维持初始基准预算和进度,同时将在项目开发过程中对其所做的更改最小化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号