首页> 外文会议>International conference on construction and real estate management >A Study on Construction-Operation Integrated Management of Megaproject: A Case of ABC International Airport
【24h】

A Study on Construction-Operation Integrated Management of Megaproject: A Case of ABC International Airport

机译:大型项目建设运营一体化管理研究-以ABC国际机场为例

获取原文

摘要

There are some coordination issues between the construction and operation phase in megaproject. To deeply understand and solve the problem, a construction-operation integration model is established in this paper, which contains the evolution of integration system, the integration process, and its mechanism. The evolution of integration system shows that the construction and operation subsystems are interweaving and integrating during the whole life cycle. The integration process model illustrates how the work in the construction and operation phase is carried out and the interface of two parties (constructor and operator). The integration mechanism describes how the two phases and related parties integrate with each other. On the basis of a single case, ABC International Airport in China, it is verified that the model is adaptable, which provides methodologies for related parties to implement integration.
机译:大型项目的建设和运营阶段之间存在一些协调问题。为了深入理解和解决这一问题,本文建立了一种构建-运营集成模型,该模型包含集成系统的演进,集成过程及其机理。集成系统的演进表明,构建和运营子系统在整个生命周期中都是交织和集成的。集成过程模型说明了在施工和运营阶段的工作是如何进行的,以及两个方面(构造者和操作者)的接口。集成机制描述了两个阶段和关联方如何相互集成。以中国ABC国际机场为例,验证了该模型的适用性,为相关方实现整合提供了方法论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号