首页> 外文会议>Historic ships >RESTORATION OF PS MEDWAY QUEEN, THE SUCCESSFUL END OF THE FIRST PHASE
【24h】

RESTORATION OF PS MEDWAY QUEEN, THE SUCCESSFUL END OF THE FIRST PHASE

机译:恢复PS Medway女王,第一阶段的成功结束

获取原文

摘要

As previously reported to this institution the task was one of producing an accurate replica of the riveted hull for the paddle steamer Medway Queen, to do this technical consultants to the Medway Queen Preservation Society (MQPS), together with David Abels as the build contractor, set out in late 2008 to interpret the 1924 steelwork drawings as described in a paper to RINA in 2009 (Ref. 1). The successful outcome of this work, the procedures put in place to monitor and accept the work leading to the delivery of the hull of the vessel to Gillingham Pier are all covered here by this paper.
机译:正如此前向该机构报告的那样,该任务是为普通船员Medway女王的铆接船体提供准确的复制品,为Medway女王保存社会(MQPS)进行这项技术顾问,以及大卫亚太区作为构建承包商,在2008年底举行,以解释1924年的钢铁工程图,如2009年到Rina的纸张中所述(参考文献1)。这项工作的成功结果,程序到位监测并接受导致船体船体的工作,以吉利汉码头覆盖。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号