STUDY ON THE MAJOR DELAY FACTORS IN FINISHING WORKS BEFORE COMPLETION OF CONSTRUCTION

机译:建设完成前整理工程的主要延误​​因素研究

获取原文

摘要

There are many variations and risks in construction work and the risk is getting increased in accordance of big scale, variation and complexity for the construction work. If the process management is not planned thoroughly, it affects the construction period. The delay of construction period causes the increase of project budget and low productivity and it is the cause of poor construction for recovering the long-term suspension of construction in construction work. There are various problems such as low quality, negligent accidents, etc. Especially, the delay of finishing work can be fatal before the completion of construction. It is study on analysis of the influence factor for delay of construction period and how to apply in real work site in finishing work. It is regarded that this study will lead to thorough process movement in work site and critical data.
机译:施工工作中有许多变化和风险,风险较大,施工工作的大规模,变化和复杂性增加。如果未彻底策划流程管理,则会影响施工期。施工期的延误导致项目预算的增加和低生产率,并且建设良差差的施工工作中长期暂停的原因。特别是诸如低质量,疏忽事故等的各种问题,特别是,在建造完成之前,整理工作的延迟可能是致命的。研究延迟施工期延迟的影响因素及如何在整理工作中申请。据认为,该研究将导致工作现场和关键数据中的彻底流程运动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号