首页> 外文会议>Annual North American Waste to Energy Conference >Power Generation and Superheater Upgrade Project at the Burnaby MSW Plant
【24h】

Power Generation and Superheater Upgrade Project at the Burnaby MSW Plant

机译:Burnaby Msw工厂的发电和超级升级项目

获取原文

摘要

Montenay Inc. operates a municipal solid waste (MSW) incinerator plant located in Bumaby, British Columbia. The facility operates three essentially identical boilers that were designed to generate slightly superheated steam at 248°C (478℉) and 3,140 kPa (455 psig). The plant was originally sized to supply process steam for export to an adjacent industrial plant. The fraction of steam that was exported decreased in recent years to about 35% of the production with the remainder being condensed. This has caused Montenay Inc. to initiate a power generation project with the goal to improve the plants energy efficiency and generate additional revenues by purchasing and operating a steam turbine generator. A superheater upgrade was required to raise the final steam temperature to a level that was suitable for use in an efficient steam turbine-generator. Jansen Combustion and Boiler Technologies Inc. (JANSEN) was contracted to perform the process and design engineering for the required boiler modifications. The project work included defining target process conditions, deriving conceptual design options, sizing the new superheater, deciding on material selection, preparing equipment specifications, and supplying the fabrication and installation drawings. The boiler modifications has been implemented in all three units in spring 2003. Power production will start in early summer 2003.
机译:Montenay Inc.经营位于不列颠哥伦比亚省Bumaby的市政固体废物(MSW)焚烧炉厂。该设施操作三个基本相同的锅炉,设计用于在248°C(478℃)和3,140kPa(455psig)上产生略微过热的蒸汽。该植物最初尺寸为供应工艺蒸汽以出口到邻近的工厂。近年来出口的蒸汽的一部分降低至约35%的生产,其余浓缩。这导致了Montenay Inc.启动发电项目,以实现植物能源效率,并通过购买和操作汽轮机发生器来产生额外的收入。需要过热器升级来将最终蒸汽温度提高到适用于高效汽轮机发生器的水平。 Jansen Combustion and Boiler Technologies Inc.(Jansen)已收缩,以执行所需锅炉修改的过程和设计工程。项目工作包括定义目标过程条件,导出概念设计选项,尺寸尺寸确定材料选择,准备设备规格以及提供制造和安装图纸。 2003年春季的所有三个单位都实施了锅炉修改。电力生产将于2003年初夏季开始。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号