An update on the reservoir evaluation and modelling study of the Mahanagdong sector in the Greater Tongonan Geothermal Field is undertaken which incorporates the data gathered since commissioning of the power plants in 1997. Results of the simulation study gave good matches to the actual data observed. Strategies implemented in the model for the forecasting runs indicates the reservoir will be able to support the production load of the sector in meeting the total power requirement of the field.
展开▼