首页> 外文会议>Air Waste Management Association's annual conference exhibition >Simplifying Compliance With The General Conformity Rule By Thresholding
【24h】

Simplifying Compliance With The General Conformity Rule By Thresholding

机译:通过阈值化简化遵守常规符合性规则

获取原文

摘要

With the implementation of the National Ambient Air Quality Standards (NAAQS) for ozone and fine particulate matter ("PM2.5"), many areas of the country will soon be designated as non-attainment area and become subject to the General Conformity Regulation (GCR) of the Clean Air Act. With this change, Federal Installations in these areas will need to implement programs to assure compliance with the GCR for projects of all sizes. Installation environmental managers not familiar with the GCR will suddenly be faced with the task of reviewing all installation projects to determine whether the "actions" are exempt, "de minimis," or significant. And managers currently subject to the GCR may need to consider new GCR significance thresholds resulting from updated emission inventories or re-designation of attainment status. Easy identification of projects requiring General Conformity Determinations can help you avoid lengthy delays in project approval and implementation. This paper will discuss an approach for simplifying GCR compliance at Federal Installations through the use of "thresholding." In developing a GCR management strategy, installation environmental managers can pre-screen common actions for their installation, and identify actions that are exempt or de minimis. Furthermore, managers can use applicable significance thresholds projects to determine "how big the project can be" before the installation needs to worry about GCR compliance.
机译:随着国家环境空气质量标准(NAAQS)的臭氧和细颗粒物质(“PM2.5”),该国的许多地区将很快被指定为非达达领域,并受到一般符合性监管的影响( GCR)的清洁空气法。通过这种变化,这些领域的联邦设施需要实施方案,以确保所有规模项目的GCR遵守GCR。不熟悉GCR的安装环境管理人员将突然面临所有安装项目的任务,以确定“行动”是否豁免,“de minimis”或重大。目前受到GCR的经理可能需要考虑由更新的排放库存或重新指定达到现状产生的新GCR意义阈值。轻松识别需要一般符合性测定的项目可以帮助您避免项目批准和实施中的冗长延迟。本文将讨论通过使用“阈值化”来简化联邦装置的GCR符合性的方法。在开发GCR管理策略时,安装环境管理人员可以预先筛选其安装的共同行动,并识别豁免或最小值的行动。此外,管理人员可以使用适用的意义阈值项目来确定在安装需要担心GCR合规性之前,“项目可以是多大”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号