首页> 外文会议>Geothermal Resources Council Annual Meeting >Geothermal Development In Mexico In 2002
【24h】

Geothermal Development In Mexico In 2002

机译:2002年墨西哥地热发展

获取原文

摘要

Geothermal production in Mexico in 2002 was 56.5 million metric tons of geothermal steam coming from the fields of Cerro Prieto, Los Azufres, Los Humeros and Las Tres Virgenes. 167 geothermal wells were in production during this year, at a combined annual average rate of 6,456 tons per hour of steam. On December 2002 the national installed capacity in these fields was of 853 MW, which will be increased to 953 MW when the Los Azufres II project (100 MW) come in line in June 2003. Generation of electricity in these geothermal fields during 2002 was 5,398 gigawatts-hour (GWh), representing 3% of the total electric generation for public service in the country.
机译:2002年墨西哥地热产品是来自Cerro Prieto,Los Azufres,Los Humeros和Las Tres Virgenes的5650万公吨的地热蒸汽。 167家热井在今年生产,每小时每小时6,456吨的年平均速度。 2002年12月,这些领域的国家装机容量为853兆瓦,当时洛杉矶奥祖尔二项目(100兆瓦)于2003年6月排队,将增加到953兆瓦。2002年期间这些地热场的电力发电为5,398 Gigawatts-Hour(GWH),代表该国公共服务总发电的3%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号