首页> 外文会议>International Conference on Software Engineering Theory and Practice >The concept comparison of BORM Points method with Use Case Points
【24h】

The concept comparison of BORM Points method with Use Case Points

机译:用例要点析读数法的概念比较

获取原文

摘要

The main objective of this article is to introduce a new concept of effort estimation method 'BORM Points' (BORMp), which is the result of the author's research. This method belongs to the group of model based method and is concerned with effort estimation for projects developed in BORM method. Following the logic behind 'Use Case Points' (UCP), the accepted method of effort estimation, BORMp eliminates certain of UCP disadvantages. The first part of the paper provides short introduction to the BORM method (Business and Object Relation Modeling). The second part introduces 'BORM Points' and compares with 'Use Case Points'.
机译:本文的主要目标是介绍一个新的努力估算方法“博物点”(Bormp),这是作者研究的结果。该方法属于基于模型的方法组,涉及锻造方法中开发的项目的努力估算。遵循“用例要点”(UCP)后面的逻辑,所接受的努力估算方法,Bormp消除了某些UCP缺点。本文的第一部分提供了对肱骨方法(业务和对象关系建模)的简短介绍。第二部分介绍了“突出点”并与“使用案例点”进行比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号