首页> 外文会议>International mine management conference >Building Asia's Latest Hard Rock Mine
【24h】

Building Asia's Latest Hard Rock Mine

机译:建立亚洲最新的硬摇滚矿

获取原文

摘要

G-Resources' Martabe Mine in North Sumatra, Indonesia, is a US$700 M world-class and world-scale operation in a country which, with a few notable smaller scale exceptions, has had no significant hard rock mining development in more than ten years. The mine was commissioned in the middle part of 2012 and poured first gold on 24 July. At full production Martabe will produce 250 000 oz/a of gold and 2-3 Moz/a of silver at cash costs in the lowest quartile. The mine location is on the west coast of North Sumatra, which experiences annual rainfall of 4 m with no notable dry season, adjacent to seismically active fault zones, and relatively close to a rural community of 31 000 people with no significant industrial experience. The management team has successfully forged strong links with the various government departments and levels in Jakarta, North Sumatra Province and the local Regencies; developed long-term relationships with the various community groups within the local district of Batangtoru to build a sustainable social licence; has dealt with the physical and environmental challenges presented by the project location, and has successfully raised more than US$900 M over a period of three years for the original acquisition then the development of the project. Whilst in its infancy of operation, the mine is set up to deliver a long-term sustainable future for the company, the shareholders, and the people of Batangtoru and all stakeholders generally. The quality of the project execution and commitment by the company will ensure that maximum value can be delivered from Martabe, not just for the current mine life but from the significant exploration potential that exists on the large tenement area that the company has access to for 30 plus years. This paper will deal with the physical challenges associated with the design, the Indonesian government regulatory requirements for mine development, the social aspects of building a world-class project in a developing area, the in-country commitment necessary for any project development anywhere in the world and the successful funding arrangements for the mine development.
机译:G-Resources的Martabe金银矿矿井北苏门答腊,印尼,是一个国家US $ 700米的世界级和世界级的操作它,有几个显着的规模较小的例外,就再也没有显著硬岩矿业开发十余年。该矿被委任在2012年的中间部分并倒在7月24日首金。在满负荷生产Martabe金银矿将生产25万盎司/一黄金和2-3万盎司/年在最低四分位数现金成本银子。该矿的位置是在北苏门答腊,其中经历了4米年降雨量没有明显的旱季,毗邻地震活动断裂带,且相对接近31万人农村社区没有显著的行业经验的西海​​岸。管理团队已经成功伪造与政府各部门及各级雅加达,北苏门答腊省和当地摄政密切的联系;与巴当托鲁所在地的区,以建立可持续的社会许可范围内的各种社会团体发展的长期合作关系;已经处理了由项目所在地所呈现的物理和环境挑战,并已成功筹得超过US $ 900米以上的原收购那么项目的开发期限为三年。虽然在其经营的起步阶段,该矿被设置为公司,股东及巴当托鲁一般人民和所有利益相关者提供一个长期的可持续的未来。项目执行和承诺由公司的质量将确保最大的价值可以从Martabe的交付,而不仅仅是目前的开采寿命,但是从对大矿权面积存在显著的勘探潜力,该公司已获得30多年。本文将处理与设计,对矿山开发印尼政府的监管要求相关的物理挑战,在发展中地区建设一个世界级项目的社会方面,在任何项目开发的任何地方所必需的国内承诺世界,面向矿山开发成功的资金安排。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号