首页> 外文会议>International Conference on Management, Manufacturing and Materials Engineering >Based on the model of ISM in risk analysis for the BT reclaimed water Project
【24h】

Based on the model of ISM in risk analysis for the BT reclaimed water Project

机译:基于ISM模型的BT再生水项目风险分析

获取原文

摘要

The source of capital construction projects is one of the bottlenecks of restricting the reclaimed water projects development which is one of the municipal infrastructures. Project financing can be solving the capital source of projects very well. Renewable water project investment and financing mode as the breakthrough point, analyzed the characteristics of the renewable water project, put forward the BT mode in renewable water the feasibility of application of the project, and analyzed the reclaimed water projects related to the main risk elements and its origin, used interpretative structure model (ISM) to establish risk factors charts, get the main risk factors should be controlled and the relationship between each other, offer the reference for the recycled water project decision-making and the risk management.
机译:资本建设项目的来源是限制了作为市政基础设施之一的再生水项目发展的瓶颈之一。项目融资可以很好地解决项目的资本来源。可再生水项目投资和融资模式作为突破点,分析了可再生水项目的特点,提出了可再生水中的BT模式,该项目的应用可行性,并分析了与主要风险成分相关的再生水项目它的起源,二手解释性结构模型(ISM)建立风险因素图表,应控制主要风险因素,彼此之间的关系,为再生水项目决策和风险管理提供参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号