首页> 外文会议>SPE Gas Oil Technology Showcase and Conference >Horizontal Well Casing Design Optimization Implementation Case Study: Vibrations Management Through Enhanced Bottom Hole Assembly Design
【24h】

Horizontal Well Casing Design Optimization Implementation Case Study: Vibrations Management Through Enhanced Bottom Hole Assembly Design

机译:水平井套管设计优化与实现案例研究:振动管理通过增强底孔组装设计

获取原文

摘要

The objective of pilot testing was to optimize horizontal well construction cycle by decreasing the number of casing strings. The testing involved drilling of 13 wells, in which only production casing was run in hole instead of intermediate casing and a liner. The key issue during drilling was failure of measurement tools due to high vibration. This paper covers decisions and actions being made to get a well with new casing design successfully drilled.
机译:导频测试的目的是通过降低套管串的数量来优化水平井结构循环。测试涉及钻孔13孔,其中仅生产套管在孔中而不是中间壳体和衬里。钻井期间的关键问题是由于高振动导致的测量工具失败。本文涵盖了在成功钻孔的新套管设计方面获得了决策和行动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号