首页> 外文会议>Geohunan international conference >Studies on Risk Management of the Urban Infrastructure Projects Based on the BOT Financing Model
【24h】

Studies on Risk Management of the Urban Infrastructure Projects Based on the BOT Financing Model

机译:基于BOT融资模式的城市基础设施项目风险管理研究

获取原文

摘要

With the acceleration of urbanized advancement in China, governments' high investment and low efficiency in urban infrastructure projects have already become a worldwide problem. The BOT financing model can be combined with government policy supports, investor's abundant fund and advanced management. The BOT financing model in urban infrastructure projects has greater risks, so their risk management is of great significance. The paper establishes risk evaluation index system of urban infrastructure projects on the BOT financing model, and sets up the risk evaluation model by use of Analytic Hierarchy Process (AHP) and Fuzzy Mathematics. We partially modify weight of AHP, by Fuzzy Cluster Analysis. Next, we establish the risk allocation model of urban infrastructure projects. Finally, we carry empirical analysis about the risk problem of an urban infrastructure project. Through comparing with result of model evaluation and measure of the risk allocation, empirical analysis indicates that the evaluation result of the model can reflect the risk situation of project thoroughly and objectively.
机译:随着中国的城市化进步加速,政府的高投资和城市基础设施项目的低效​​率已经成为全球问题。机器人融资模式可以与政府政策支持相结合,投资者的丰富基金和先进管理。城市基础设施项目的BOT融资模式具有更大的风险,因此其风险管理具有重要意义。本文建立了BOT融资模式的城市基础设施项目风险评估指标体系,通过使用分析层次过程(AHP)和模糊数学来建立风险评估模型。通过模糊聚类分析,我们部分修改AHP的重量。接下来,我们建立了城市基础设施项目的风险分配模式。最后,我们对城市基础设施项目的风险问题进行了实证分析。通过与模型评估和风险分配衡量的结果进行比较,实证分析表明该模型的评估结果可以彻底和客观地反映出项目的风险状况。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号