Christina Lake Thermal Project

机译:克里斯蒂娜湖温泉项目

获取原文
获取原文并翻译 | 示例

摘要

This paper provides a description of PanCanadian’s ChristinarnLake Thermal Project. PanCanadian is implementing arncommercial steam assisted gravity drainage (SAGD) project tornrecover 7.5 to 9.0 API bitumen from the Athabasca oil sandsrnin the McMurray Formation. The project is located inrnNortheast Alberta, approximately 130 km north of Lac LarnBiche and 170 km south of Fort McMurray, in township 76rnrange 6 W4M.rnThe project will be built in three phases for total bitumenrnproduction of 70,000 barrels of bitumen per day. Phase 1 willrnproduce 10,000 bpd, with Phases 2 and 3 producing 30,000rnbpd each. This paper will outline PanCanadian’s reasons forrntaking a phased approach to the Christina Lake development.rnDual well SAGD will be implemented with 500 to 750 m longrnhorizontal well pairs. Phase 1 is expected to begin steamingrnoperations in the fourth quarter of 2001. The timing ofrnsubsequent phases will depend on Phase 1 results, marketrnconditions and project economics. In March, 2000rnPanCanadian received Alberta Energy and Utility Boardrnapproval for the project.
机译:本文介绍了PanCanadian的ChristinarnLake热量项目。 PanCanadian正在实施商业蒸汽辅助重力排水(SAGD)项目,以从McMurray地层的Athabasca油砂中回收7.5至9.0 API沥青。该项目位于艾伯塔省东北部,拉克比恩湖以北约130公里,麦克默里堡以南170公里,位于76rnrange 6 W4M镇。该项目将分三期建设,每天总沥青产量为70,000桶沥青。第1阶段将产生10,000 bpd,第2和第3阶段将分别产生30,000 bpd。本文将概述PanCanadian对克里斯蒂娜湖开发采取分阶段方法的原因。双井SAGD将在500至750 m长的水平井对中实施。预计第一阶段将在2001年第四季度开始投入运营。后续阶段的时间将取决于第一阶段的结果,市场条件和项目经济状况。 2000年3月,PanCanadian获得了该项目的亚伯达省能源和公用事业局的批准。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号