Taking the Xuzhou urban rail transit line 1 engineering as an example,in view of the existing quality control problems of high perform-ance concrete in this engineering application,from the concrete raw materials management,mix proportion design,concrete production,pouring and maintenance and other aspects,put forward specific quality control measures,ensured the construction quality of high performance concrete of this engineering.%以徐州市城市轨道交通1号线工程为例,针对高性能混凝土在该工程应用中存在的质量控制问题,从混凝土原材料管理、配合比设计、混凝土生产、浇筑与养护等方面,提出了具体的质量控制措施,保证该工程高性能混凝土的施工质量。
展开▼