首页> 中文期刊> 《价值工程》 >风电项目全过程造价控制与管理探讨

风电项目全过程造价控制与管理探讨

         

摘要

The whole-process cost control and management of wind power projects has become the inevitable trend developing socialist social market economy, only through static control and dynamic management of the project cost and rational allocation and utilization of program funds we maximize the profit of engineering projects. From the features of the whole-process cost control and management in wind power projects and design stage division of wind power projects, this article describes the whole-process cost control and management of decision-making project, design stage, tender offering stage, construction stage and conclusion stage.%风电项目全过程造价控制与管理已经成为市场经济发展的必然趋势,只有对项目实行工程造价的静态控制与动态管理,使企业投入项目的资金得到合理的配置和利用,才能最大程度的发挥工程项目的效益.本文从风电项目全过程造价控制与管理的特点出发,结合风电项目的设计阶段划分,阐述在项目决策阶段、可研阶段、招投标阶段、施工阶段和竣工验收阶段的全过程造价控制.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号