Combining the construction condition of the well sinking construction of CW Pump House, the article has introduced the special construction method, gist and experience of the said construction in detail.%结合印度尼西亚Palabuhan Ratu 3x350MW燃煤电站海边循环水泵房沉井全过程施工状况,详细的介绍了海洋工程中海边沉井这一特殊施工方法、要点及经验.
展开▼