In view of the actual construction of Tingzikou Water Control Project,the extra-large surface concrete roller compaction is adopted.Through resource allocation optimization and reasonable organization and coordination,the construction technologies for concrete transport,paving,roller-compacted and curing are optimized,and the control indicators are clearly defined and strictly implemented.The construction quality control is satisfactory.%结合亭子口水利枢纽工程实际情况,在特大碾压仓施工中,优化资源配置,合理组织协调,在混凝土运输、摊铺、碾压、养生中优化施工工艺,明确并严格执行控制指标,取得了满意的施工控制效果.
展开▼