首页> 中文期刊> 《人民长江》 >云南龙开口水电站移民逐年补偿安置方式探讨

云南龙开口水电站移民逐年补偿安置方式探讨

         

摘要

Longkaikou Hydropower Station in Yunnan Province is the sixth grade of eight cascades in the middle reaches of Jin-sha River, and the special check and acceptance for land acquisition and resettlement has completed in October, 2012. This pa-per reviews the planning and design of resettlement, and systematically summarizes the treatment solutions to corresponding tech-nical challenges during the resettlement, including the population calculation to be compensated year-by-year, compensation standard and dynamic adjustment mechanism, compensation years and funds sources, as well as decomposition of the compensa-tion population.%云南龙开口水电站是金沙江中游河段8个梯级中的第6级电站,电站建设征地移民安置已于2012年10月通过专项验收。系统回顾了该电站建设征地移民安置规划设计工作,梳理了移民安置过程中相关技术问题的处理,并对逐年补偿安置方式的补偿人口计算与界定、标准及动态调整机制、年限及资金来源、补偿人口分解等关键技术问题进行了分析与总结,可为类似工程移民安置规划工作提供借鉴。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号