首页> 外文期刊>Air Force Magazine >Proceed Cautiously On Strategic Airlift
【24h】

Proceed Cautiously On Strategic Airlift

机译:谨慎进行战略空运

获取原文
获取原文并翻译 | 示例
           

摘要

With questions still surrounding the future of the C-5 Galaxy transport fleet, the Department of Defense should apply "careful planning" to ensure that C-17 Globemaster III production is not ended prematurely and then restarted at a substantial cost, stated the Government Accountability Office in a Nov. 21 report on strategic airlift. The Air Force plans to upgrade the cockpits and communications and navigation gear on all 111 of its C-5s under the C-5 Avionics Modernization Program. And it is installing new engines on 52 of them under the Reliability Enhancement and Re-engining Program. These 52 will be known as C-5M Super Galaxy aircraft. GAO stated that the Air Force's $9.1 billion budget for both C-5 modernization efforts "may be understated" due to DOD's lack of proper risk and uncertainty analysis. Moreover, the Congressional watchdog agency said the RERP is "underfunded by almost $300 million" and may be unachievable if the engine production schedule is not met.
机译:由于政府对C-5银河运输机队的未来仍存在疑问,国防部应采取“周密的计划”,以确保C-17 Globemaster III的生产不会过早结束,然后以高昂的成本重启,办公室在11月21日的战略空运报告中。空军计划根据C-5航空电子设备现代化计划升级其所有111架C-5的驾驶舱,通讯和导航设备。根据可靠性增强和重新参与计划,它正在其中52台上安装新引擎。这52架将被称为C-5M超级银河飞机。 GAO表示,由于国防部缺乏适当的风险和不确定性分析,空军用于C-5现代化工作的91亿美元预算“可能被低估了”。此外,国会监督机构表示,RERP“资金不足3亿美元”,如果发动机生产时间表未达到,则可能无法实现。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号