首页> 外文期刊>Civil Engineering >Architect Sued In Federal Court For Fraudulent Concealment
【24h】

Architect Sued In Federal Court For Fraudulent Concealment

机译:建筑师因欺诈性隐瞒在联邦法院被起诉

获取原文
获取原文并翻译 | 示例
           

摘要

In most cases, subcontractors have no direct cause of action against the federal government and can recover only if they go through the prime contractor. This is generally done in one of two ways. In the first, subcontractor claims are allowed if they are sponsored or certified by a prime contractor and are brought in the prime contractor's name. In the second, a prime contractor can include its liability to a subcontractor in its claimed damages against the government. These pass-through scenarios, however, can lead to litigation if the prime contractor and the subcontractor do not agree on the nature or scope of a claim or on the manner in which it is presented.
机译:在大多数情况下,分包商没有直接针对联邦政府的诉讼因由,只有在通过主承包商的情况下才能恢复原状。通常以两种方式之一完成此操作。首先,如果由主承包商赞助或证明并以主承包商的名义提出,则允许分包商提出索赔。在第二种情况下,主承包商可以将其对分包商的责任包括在对政府的索赔损失中。但是,如果主承包商和分包商不同意索赔的性质或范围或提出索赔的方式,则这些传递方案可能导致诉讼。

著录项

  • 来源
    《Civil Engineering》 |2013年第8期|88-88|共1页
  • 作者单位

    President and Chief Executive Officer, Capital Project Strategies, LLC, Reston, Virginia;

    Attorney, Briglia McLaughlin, PLLC, Vienna, Virginia;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号