【24h】

TURKISH DELIGHT

机译:土耳其软糖

获取原文
获取原文并翻译 | 示例
           

摘要

ISWA's Middle East, Balkan and Mediterranean Regional Development Network invited the organisation's Working Group for Sanitary Landfill to host a training course on its specialist subject in the Turkish capital of Istanbul. Two days of lectures, including an additional section on sludge management, were attended by more than 70 delegates, and were followed by a technical tour, which is the focus of this review. Visits were made to facilities managed and operated by the Istanbul Metropolitan Municipality Environment Protection and Waste Recycling Company (ISTAC). The first port of call was the Hasdal landfill site and landfill gas to energy plant. The landfill site had closed in 1997 with in excess of 5m tonnes of municipal waste deposited. It was only in 2000 that a landfill gas collection system was installed, which was directed to four Jenbacher gas engines rated at 1.1MW each and is now regularly delivering 4MW of electricity to the electricity supply network.
机译:ISWA的中东,巴尔干和地中海区域发展网络邀请该组织的卫生垃圾填埋工作组在土耳其首都伊斯坦布尔举办有关其专业主题的培训课程。超过70名代表参加了为期两天的讲座,包括有关污泥管理的附加部分,随后进行了技术巡视,这是此次审查的重点。参观了由伊斯坦布尔市环境保护和废物再循环公司(ISTAC)管理和运营的设施。第一个停靠港是哈斯达尔垃圾填埋场和填埋气发电厂。垃圾掩埋场在1997年关闭,堆积了超过500万吨的城市垃圾。直到2000年,才安装了垃圾填埋气收集系统,该系统直接连接到四个Jenbacher燃气发动机,每台发动机的额定功率为1.1MW,现在定期向供电网络输送4MW的电能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号