【24h】

IN MY BACKYARD

机译:在我的后院

获取原文
获取原文并翻译 | 示例
           

摘要

The Isle of Man has a long history, beautiful scenery, a thriving finance sector and -since August 2004 - a shiny new energy from waste (EfW) plant. From first discussions to plant hand over, the lead-time has been around 20 years. The Isle of Man's politicians and technical officers opted for proven EfW technology because they felt it was inappropriate to risk reliance on novel or unproven waste management technologies in their already-constrained circumstances. The island has limited space for landfill, little reprocessing capacity for recyclables and not much land for compost application. Electricity generation offered a guaranteed market while the volume reduction of waste from EfW would help conserve landfill void space.
机译:马恩岛历史悠久,风景秀丽,金融业蓬勃发展,自2004年8月以来,这是一种发光的废旧新能源(EfW)工厂。从最初的讨论到工厂移交,交付周期约为20年。马恩岛的政客和技术人员选择了成熟的EfW技术,因为他们认为在他们已经受限制的情况下冒着依赖新颖或未经验证的废物管理技术的风险是不合适的。该岛的填埋空间有限,可回收物的后处理能力很小,堆肥应用的土地也很少。发电提供了有保障的市场,而减少了EfW产生的废物量将有助于节省垃圾填埋场的空间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号