Early Warning Signs of Construction Claims and Disputes

机译:施工索赔和争议的预警信号

获取原文
获取原文并翻译 | 示例
           

摘要

It is axiomatic that claims and disputes on projects do not appear out of nowhere. Experience indicates that when a dispute occurs, there is a history of events, decisions, lack of decisions, etc. that can be traced back from a few weeks to several years. These are early warning signs of claims and disputes. Typically, it is when claims are filed at the end of a project that attorneys and claims consultants review project documentation and interview the project team in order identify such early warnings. This article lists numerous "early warning signs" of disputes. There is little literature setting forth a detailed list of early warning signs of claims and disputes. Based on the collective observations of numerous construction claims consultants, the author collated these early warning signs into typical project phases. This article also identifies which party should watch for which early warning sign and what sort of claim or dispute may arise. This article was first presented at the 2016 AACE International Annual Meeting as OWN.2140.
机译:理所当然的是,对项目的索赔和争议并非一无是处。经验表明,发生争执时,有事件,决策,缺乏决策等的历史可以追溯到几周到几年。这些是索赔和争议的预警信号。通常,在项目结束时提出索赔时,律师和索赔顾问会审查项目文档并采访项目团队,以识别此类早期警告。本文列出了许多争端的“早期预警信号”。很少有文献提出索赔和争议的早期预警信号的详细列表。基于众多施工索赔顾问的集体观察,作者将这些预警信号整理到典型的项目阶段。本文还确定了哪个当事方应注意哪个预警信号以及可能出现哪种索赔或争议。本文最初在2016年AACE国际年会上以OWN.2140的形式发表。

著录项

  • 来源
    《Cost engineering》 |2017年第1期|4-28|共25页
  • 作者

    James G. Zack;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号