首页> 外文期刊>Journal of Project Management >Towards a sustainable construction industry: Delays and cost overrun causes in construction projects of Oman
【24h】

Towards a sustainable construction industry: Delays and cost overrun causes in construction projects of Oman

机译:迈向可持续建筑业:阿曼建设项目的延误和成本超支原因

获取原文
           

摘要

Every nation in the globe endeavours to achieve sustainable growth in its various industries. The construction industry has an enormous contribution to the economy primarily for the developed nations experiencing urgent demands to develop and expand their infrastructure. While this expansion is taking place through projects, it is essential to find the factors affecting completion of project premium. This paper investigates the main time delay and cost overrun causes in construction projects within Oman related to clients, contractors, and consultants. Through a comprehensive literature review, reasons for delays and cost overrun are determined and a survey targeting 100 project managers was conducted to indicate top causes among them. The findings may help the government develop better policy and construction firms to modify criteria procedures to avoid such drawbacks.
机译:全国各国在全球致力于实现其各个行业的可持续增长。建筑业对经济的巨大贡献,主要是为发达国家经历迫切需要开发和扩大其基础设施的发达国家。虽然这种扩展正在通过项目进行,但必须找到影响项目溢价完成的因素。本文调查了与客户,承包商和顾问相关的阿曼建设项目中的主要时间延迟和成本超支原因。通过全面的文献综述,确定延误和成本超支的原因,并进行了一个针对100个项目经理的调查,以表明其中的最大原因。调查结果可以帮助政府制定更好的政策和建筑公司来修改标准程序,以避免此类缺点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号