首页> 外文期刊>Hydro Review Worldwide >Solving a Unit Alignment Problem
【24h】

Solving a Unit Alignment Problem

机译:解决单位对准问题

获取原文
获取原文并翻译 | 示例
           

摘要

When personnel with Furnas Centrais Eletricas S.A. began modernizing the 1,216-MW Furnas plant, they discovered damage to Unit 6 caused by alkali-aggregate reaction. The bottom stationary wearing ring was out of round, and the wicket gate stems were out of alignment. The plant owner and contractor worked together to design and implement an on-site machining effort to bring the unit back into alignment.
机译:当Furnas Centrais Eletricas S.A.的人员开始对1,216兆瓦的Furnas工厂进行现代化改造时,他们发现了6号机组因碱集料反应而损坏。底部固定式磨损环不圆,并且检票口门杆未对准。工厂所有者和承包商共同设计和实施了现场加工工作,以使设备重新对准。