...
【24h】

Briefings

机译:简报

获取原文
获取原文并翻译 | 示例
           

摘要

The hydropower utility in Russia's Dagestan Republic announced a development program that envisions building three cascades of hydro projects totaling 2,400 mw plus numerous smaller hydro projects by 2020. Dagestan, on the shore of the Caspian Sea, has utilized only 10 percent of its hydropower potential, which is estimated at 16,000 MW.JSC Regional Power Generation Co. of Dagestan (Dagenergo) said it plans to build a cascade of five hydro projects, totaling 1,000 mw, on the Andi Koisu River by 2010. Construction is to begin in 2007 on the first, 200-mw Agvali. It plans another cascade totaling 1,100 mw on the Avar Koisu River. In 2007, work is to be carried out on the 100-mw Gotsati project on the Avar Koisu. Construction is to start in 2007 on the 200-mw Akhti 2 project, the first of four totaling 300 mw on the Samur River.
机译:俄罗斯达吉斯坦共和国的水电公司宣布了一项开发计划,该计划设想到2020年建设三个梯级水电项目,总水电发电量为2400兆瓦,外加众多小型水电项目。达里斯坦位于里海沿岸,仅利用了其10%的水电潜力,达吉斯坦(Jagenergo)的JSC地区发电公司说,它计划到2010年在安迪·科伊苏河上建造一个由五个水电项目组成的级联,总计1000兆瓦。该项目将于2007年开始建设。首先是200兆瓦的Agvali。它计划在阿瓦尔·克苏苏河上再进行一次级联,总流量为1100兆瓦。 2007年,将在Avar Koisu上进行100兆瓦Gotsati项目的工作。 200兆瓦的Akhti 2项目将于2007年开始建设,这是萨穆尔河上四个总计300兆瓦的项目中的第一个。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号